Do-It-Yourself Fiberglass Pool Kit Info

  1. Check with your county building department to see if a building permit is required and how to obtain one.
  2. You will need an excavator to dig the hole and do the backfilling of yor pool. Detailed instruction manual and dig instructions will be given.
  3. When we bring the pool, you will need 2 truck loads of riversand (approx. 40 tons).
  4. You will need a small crane truck to off-load the pool (a 5 ton boom-truck is fine).
  5. If you live in an area with a high water table, you must install a well point.
  6. You will need an electrician to hook-up 220v.pump and 110 v. light.
  7. You will need to find a contractor to do the concrete deck around the pool.

    **To find an excavator, sand company,crane rental company, electrician or contractor to do your deck, you may find it helpful to check your local yellow pages.

    *** Please note the pool must be grounded for safety

Self Installation

Installing your own fiberglass pool is easy as 1. 2. 3.

Step 1 : Preparing the site : Excavate the hole and line with sand.

Step 2 : Setting and Backfilling: We will help you set and level the pool and oversee the backfilling.
Step 3 : Pour your decking

 


HomeFiberglass Swimming Pools Company HistoryContact Tallman Pools

Tallman Pools
770-478-2257

1-800-305-5931 toll free phone

8993 Tara Blvd.
Jonesboro, GA 30236

©2005 Discount Fiberglass Pools, Inc. DBA Tallman Pools. All rights reserved. Content of this website may not be reproduced without permission.