Checklist
  • Check with your county building department to see if a building permit is required and how to obtain one.
  • You will need an excavator to dig the hole and do the backfilling of your pool. Dig diagrams will be provided and we will speak to your excavator and review the measurements. (It is important that we talk with your excavator).
  • Your excavator will need to be on-site the day we deliver your pool with a bobcat to do the backfilling.
  • When we bring the pool, you will need 2 truck loads of riversand; (approx. 40 tons), on-site - not in the hole (this amount may vary, depending on pool size).
  • You will need a small crane truck to off-load the pool with four 20' straps with hooks; (a 5 ton boom-truck is usually fine depending on your yard).
  • If you live in an area with a high water table, you must install a well point. Please contact our office for details.
  • You will need an electrician to hook up a 220 v. pump with a 20 amp breaker. If you purchase a pool light, please contact our office for requirements.
  • Please note the pool must be grounded for safety. We would like to review the electrical hook-up with your electrician.
  • You will need to find a contractor to do the concrete deck around the pool.
  • Tallman Pools will gladly assist you in finding the contractors you will need.

Your sales representative will go over all of this information and more.